Progress at Southsea Tennis Pavilion

Work is progressing at the Tennis Pavilion. Both roofs are now watertight, some of the parapet coping stones have been installed and the window are going in.

WindowWise installing the ground floor sliders.

WindowWise installing the ground floor sliders.

Parapet coping stones (precast concrete)

Parapet coping stones (precast concrete)

Roof joists

Roof joists